78615 (2024). Hon Julie Anne Genter to the Minister of Transport
Written Question
Published date: 16 Dec 2024
78615 (2024). Hon Julie Anne Genter to the Minister of Transport: What traffic modelling, if any, was used to determine the time savings impact referred to in recent announcement of the "preferred solution" for the Mt Vic Tunnel and SH1 upgrades in central Wellington, and is it publicly available?
Hon Simeon Brown: I am advised that modelling was conducted using a range of industry standard models, including the two that can be found at the following link: https://wellingtontransportanalytics.co.nz/tools