60049 (2024). Tangi Utikere to the Minister of Transport
Written Question
Published date: 07 Oct 2024
60049 (2024). Tangi Utikere to the Minister of Transport: How much of the $1,741,535 that the NZTA has spent is related to the long tunnel option?
Hon Simeon Brown: I am advised that spending on the SH1 Second Mt Victoria Tunnel and Basin Reserve upgrade, as well as the long tunnel investigations have been treated as one project and therefore are unable to be separated out.