56322 (2025). Hon Julie Anne Genter to the Minister of Transport

Written Question
Published date: 18 Dec 2025
56322 (2025). Hon Julie Anne Genter to the Minister of Transport: Will the walking and cycling elements of the SH1 Improvement Project meet the minimum recommended width, and how many cyclists are expected per hour at peak times?
Hon Chris Bishop: I am advised that yes, the proposed 3.6 metre-wide shared path in the second Mt Victoria Tunnel will meet the recommended minimum width for a shared path. Current design assumptions anticipate approximately 200 additional walking and cycling trips per day, giving an estimated 75 to 100 cyclists during the peak hour, based on existing usage patterns and projected growth.