35382 (2025). Tangi Utikere to the Minister of Transport

Written Question
Published date: 01 Aug 2025
35382 (2025). Tangi Utikere to the Minister of Transport: What is the estimated total cost to NZTA and its contractors for second and third or subsequent pothole repairs carried out between January and June 2025, as recorded in WPQ 32931 (2025)?
Hon Chris Bishop: I refer the Member to my answer to Written Question 35381 (2025). Because of these repairs being completed under a single lump sum, an estimate of the costs for second, third and subsequent repairs to potholes cannot be made at this time.