33722 (2026). Tangi Utikere to the Minister for Rail

Written Question
Published date: 27 Jul 2026
33722 (2026). Tangi Utikere to the Minister for Rail: What is the estimated cost of the new linkspan, linkspan approach structure and passenger walkway required at Wellington, which Ferry Holdings Limited's Statement of Performance Expectations 2026/27 states were initially envisaged to be reused but were found to be technically infeasible to reuse?
Rt Hon Winston Peters: Reply due: 05 Aug 2026