33701 (2026). Tangi Utikere to the Minister for Rail
Written Question
Published date: 12 Aug 2026
33701 (2026). Tangi Utikere to the Minister for Rail: What is the estimated cost of the common linkspan design being procured for both Wellington and Picton, and has the contract with the preferred linkspan supplier been signed?
Rt Hon Winston Peters: This information cannot be disclosed at this time for commercial reasons, but works are progressing well.