29148 (2026). Hon Kieran McAnulty to the Minister for Infrastructure
Written Question
Published date: 13 Jul 2026
29148 (2026). Hon Kieran McAnulty to the Minister for Infrastructure: Further to reply 24306 (2026), what was the original agreed scope, including the length of pathway, and what is the reduced scope now to be delivered for the Te Whau Pathway?
Hon Chris Bishop: Original scope – Construction of approx. 4km of 4m wide boardwalk and 1km of concrete path to contribute towards the 15km long shared pathway.
Reduced Scope to be delivered - Construction of approx. 1.6km of 4m wide boardwalk and 270m of concrete path Roberts Field to SH16 plus section Wingate Street to Ken Maunder Park to contribute towards the 15km long shared pathway (Area 1 and Area 2).