27003 (2023). Tangi Utikere to the Minister of Transport

Written Question
Published date: 21 Dec 2023
27003 (2023). Tangi Utikere to the Minister of Transport: Does the Minister intend to “Require contractors to minimise the use of temporary speed limit reductions at road maintenance sites at times when frontline workers are off-site and risk to motorists is mitigate. If temporary speed reductions are necessary for a period after resealing, this should be communicated to motorists with signage)”, as outlined in the National Party’s ‘Accelerate NZ’ document, and if not, why not?
Hon Simeon Brown: I refer the Member to reply number 26866 (2023)