8942 (2024). Lemauga Lydia Sosene to the Minister responsible for Ministerial Services
Written Question
Published date: 09 May 2024
8942 (2024). Lemauga Lydia Sosene to the Minister responsible for Ministerial Services: How much, if anything, has been spent on repairs and maintenance work at Premier House since 27 November 2023?
Rt Hon Christopher Luxon: The Department of Internal Affairs is responsible for managing and maintaining Premier House on behalf of the Crown. Routine repairs and maintenance activities based on the planned preventative maintenance (PPM) schedule are ongoing and occur regularly with timeframes based on requirements.
The total amount as at the end of February 2024 was $0.085m. The costs of maintenance at Premier House from the end of November 2023 to the end of February 2024 were:
Painting $45,714 Includes five bedrooms, four bathrooms, walls, and ceilings - current paintwork is circa 1990 and showing substantial wear and tear.
Furniture repairs/refurbishment $4,206.55 Replace damaged wardrobe mirror, clean and re-stain of outdoor furniture and furniture repairs.
Full exterior washdown of building $6,292.26 Full washdown which includes machinery and abseiling equipment.
Air conditioning installation $25,432.65 Includes units, labour, and ducting in roof cavity.
Location of the cooling system and installation impacted by age, size, and scale of building (external ducting works were required).
Service commercial kitchen $391.86 Services repair of gas appliances.
Removal of large curtain pelmets $1,099.05
Wall repair $2,537.02
Total Cost $85,673.39
This is the latest available information regarding maintenance costs for the Premier House site.
The annual costs for repairs and maintenance for Premier House are published annually in the Department’s Annual Reports.