8190 (2026). Scott Willis to the Minister for Energy

Written Question
Published date: 25 Mar 2026
8190 (2026). Scott Willis to the Minister for Energy: Is it possible that the levy range for funding the proposed Liquefied Natural Gas import terminal could exceed $4/MWh if the capital costs for infrastructure increase beyond current maximum projections?
Hon Simon Watts: Procurement is ongoing, and the required levy will be finalised during that process. I do not expect it to deviate from the indicated range.