6188 (2026). Hon Dr Megan Woods to the Minister for Energy
Written Question
Published date: 10 Mar 2026
6188 (2026). Hon Dr Megan Woods to the Minister for Energy: What is the earliest and latest timeframes the LNG terminal could be operational?
Hon Simon Watts: This will be subject to the specific contractual arrangement, I have indicated the terminal could be operational as early as 2027 or early 2028